Bridge Repair on US Hwy 50 in Las Animas Starts Oct 21, 2024


Description: Project Map: US 50 Las Animas Bridge Repair October 2024 through March 2026. Project Location on US Highway 50 from Mile Point 399.85 to Mile Point 401.69 just north of the City of Las Animas.

― Project Announcement ―
Bridge repair operations on US 50 the north end of Las Animas

Traffic will be reduced to a single lane in each direction beginning October 21

Bent County — The Colorado Department of Transportation and contract partner Myers and Sons Construction will begin bridge repair operations on US Highway 50 just north of the city of Las Animas Monday, Oct. 21. The work will take place between Mile Point 399.85 and MP 401.69. This project will consist of bridge deck asphalt removal and bridge bearing device repair followed by bridge deck resurfacing and striping. This project will improve the structural soundness of this bridge increasing its lifespan and will update the roadway surface. Work is expected to be complete spring 2026.

For the first phase of the project, the eastbound bridge will be closed with traffic being detoured to one lane in each direction on the westbound bridge. Once the eastbound bridge work is complete, which is anticipated to take 11 months, the westbound bridge will be closed and traffic will be switched to one lane in each direction on the eastbound bridge. 

Traffic Impacts 

Beginning Oct. 21, Motorists and area residents can expect the following impacts during construction: 

  • Daytime work hours range from 7 a.m. to 7 p.m. Monday through Friday.

  • Traffic will be reduced to one lane in each direction over the bridge by traffic cones and signage for the duration of the project.

  • Speeds will be reduced to 40 mph through the work zone.

  • Width restrictions will be in place.

  • Traffic fines will be doubled in the work zone.

  • Motorists should slow down as they approach the work zone, drive with caution, allow extra space between vehicles and give themselves extra travel time.

Project Information 

For additional information about this project:

Webpage:  codot.gov/projects/us50lasanimasbridge
Information hotline: 719-245-2671
Email: us50bridge@yahoo.com

Know Before You Go

Travelers are urged to “know before you go.” Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:

Remember: Slow For The Cone Zone

The following tips are to help you stay safe while traveling through maintenance and construction work zones.

  • Do not speed in work zones. Obey the posted speed limits.

  • Stay Alert! Expect the unexpected.

  • Watch for workers. Drive with caution.

  • Don't change lanes unnecessarily.

  • Avoid using mobile devices such as phones while driving in work zones.

  • Turn on headlights so that workers and other drivers can see you.

  • Be especially alert at night while driving in work zones.

  • Expect delays, especially during peak travel times.

  • Allow ample space between you and the car in front of you.

  • Anticipate lane shifts and merge when directed to do so.

  • Be patient!

About CDOT

The Colorado Department of Transportation’s mission is to provide the best multi-modal transportation system that most effectively and safely moves people, goods and information. CDOT maintains more than 23,000 lane miles of highway, more than 3,400 bridges and 35 mountain passes. Our team of employees works tirelessly to reduce the rate and severity of crashes and improve the safety of all modes of transportation. CDOT leverages partnerships with a range of private and public organizations and operates Bustang, an interregional express bus service. Find more details at codot.gov.